Steve,
Yikes, so to confirm, even on your or anybody's double-walled
cells the best BTS location is down the side of the cell. It seems so
thermally distance/insulated from the electrolyte and lead which we are
all so concerned about protecting. I've said this before, no doubt I'm
in the minority but I would be willing to insert a polypropylene encased
BTS sensor into a 1/4" hole in the top of a cell, sealed with a viton
O-ring. We are talking about some battery packs costing $5,10,20K, I
consider it one of my prime services is to insure the best lifecycle of
the pack. It seems this arrangement would insure the BTS is doing a
much better job of adjusting CC settings.
Bill
Feather River Solar Electric
Bill Battagin, Owner
4291 Nelson St.
Taylorsville, CA 95983
530.284.7849
CA Lic 874049
www.frenergy.net
_______________________________________________
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org