Any issues except the usual ac coupled control mechanisms?
I am looking at a way to have about 14kw of pv in a grid-tie battery backup scenario. Current plan is to use an ac-coupled system with enphase and avoid metallic conduit through the building and save on other issues. The challenges are going to be how to handle all this excess PV properly for the grid-tie configuration - perhaps two double stacks of Outbacks would work? Best, erika ********************* Ohio License # 44844 NABCEP Certified Solar PV Installer R Certified Home Energy Rater REpower SOLUTIONS DBE, EDGE, SBE, FBE, CSB Visit online: <http://www.repowersolutions.com> www.repowersolutions.com Renewable energy and home energy audits 540 East 105th Street; Cleveland, OH 44108 (p) 216.268.2275; (c) 216.402.4458; (f) 216.803.6739
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org