Any issues except the usual ac coupled control mechanisms?

 

I am looking at a way to have about 14kw of pv in a grid-tie battery backup
scenario. 

Current plan is to use an ac-coupled system with enphase and avoid metallic
conduit through the building and save on other issues.

The challenges are going to be how to handle all this excess PV properly for
the grid-tie configuration - perhaps two double stacks of Outbacks would
work? 

 

Best,

erika

 

 

*********************

Ohio License # 44844
NABCEP Certified Solar PV Installer R

Certified Home Energy Rater

 

REpower SOLUTIONS

DBE, EDGE, SBE, FBE, CSB
Visit online:  <http://www.repowersolutions.com> www.repowersolutions.com
Renewable energy and home energy audits
540 East 105th Street; Cleveland, OH 44108

(p) 216.268.2275; (c) 216.402.4458; (f) 216.803.6739

 

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to