Wrenches,

U.S. electricians have different rooftop wiring and conduit options that worked 
successfully before PV and work well with PV. The same holds true for Europe. 
I've seen bad and sloppy work on both sides of the pond. John Berdner and 
others familiar with European wiring practices and double-insulated wire will 
attest that are safe and have performed well for decades before PV. Let's face 
it. Knowledgeable and discerning European customers would never spend billions 
of Euros on gigawatts on poorly wired solar arrays. Sure, it drives good 
electricians crazy to see European array wiring laying loose on roofs just as 
it bothers us to see poor quality wiring anywhere. Email me off-list for German 
wiring examples in a presentation about double-insulated wire.

Joel Davidson

----- Original Message ----- 
  From: William Miller 
  To: RE-wrenches 
  Sent: Friday, October 09, 2009 5:31 PM
  Subject: Re: [RE-wrenches] Rooftop wiring methods between multiple subarrays


  Colleagues:

  I think the correct answer is: there are no short cuts to good workmanship.  
It requires intelligent design, a judicious selection of materials and careful 
installation.  EMT is appropriate in low corrosion environments, PVC if you can 
control UV damage and accommodate expansion.  There are aluminum and stainless 
conduits for the extreme environments and demanding aesthetics.  I am sorry 
that there are no easy ways to pursue quality.

  It is my understanding that the European model is to "plug and pray" with 
quick connect cables, running them across roof tops and stapling them to 
exterior walls.  I don't know this for a fact, but if it is true, I hope that 
market does not drive the US market towards reduced standards.  I belive it is 
short sighted to skimp on wiring methods with dangerous power feeds.  I think 
the loss of conduit boxes on modules is a direct result of European 
installation techniques and a trend towards reducing labor costs.  I welcome 
information from those of you with experience in other markets to verify these 
hunches.

  William Miller



  At 04:21 PM 10/9/2009, you wrote:

    EMT needs to be "pickled"  with vinegar or acid, to get the paint to hold. 
I love it for inland work, but near the ocean, it'll rust through in 5 years. 
I'm not sure how much more time paint would buy you.
    Anybody use other plastic materials HDPE? Supposed to not have the 
expansion problems of PVC.


    R. Walters
    r...@solarray.com
    Solar Engineer




      If you have to run around the roof with EMT, you can protect it from rust
      with a coat of paint.

      Regards,
      -Hans

  Please note new e-mail address and domain:

  William Miller 
  Miller Solar
  Voice :805-438-5600     Fax: 805-438-4607       
  email: will...@millersolar.com
  http://millersolar.com
  License No. C-10-773985




------------------------------------------------------------------------------


  _______________________________________________
  List sponsored by Home Power magazine

  List Address: RE-wrenches@lists.re-wrenches.org

  Options & settings:
  http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

  List-Archive: 
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

  List rules & etiquette:
  www.re-wrenches.org/etiquette.htm

  Check out participant bios:
  www.members.re-wrenches.org

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to