Hello Wrenches, I have a prospect who has an existing PV system and a small wind turbine already in place. He is interested in adding additional capacity via another small grid tie system. The attached drawing outlines the existing and proposed installation. My question has to do with the grid tie in. Given the existing connections for the 2 existing DGT inverters can I connect as proposed in the drawing or would I need to perform a line side tap on the primary feed.
Alternative suggestions appreciated. Carl Adams SunRock Solar, LLC
DGT Upgrade Single Line Drawing.pdf
Description: Adobe PDF document
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org