Wrenches,

PV installers in the LADWP area are being told to put a disconnect switch and circuit breaker between the revenue meter and the customer's service panel if we use a line-side tap. Do any other electric utilities require PV system disconnect switch and a 2nd additional disconnect switch on a PV system with a line-side tap?

Thanks in advance for your input.

Joel Davidson

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org