Wrenches,
PV installers in the LADWP area are being told to put a disconnect switch
and circuit breaker between the revenue meter and the customer's service
panel if we use a line-side tap. Do any other electric utilities require PV
system disconnect switch and a 2nd additional disconnect switch on a PV
system with a line-side tap?
Thanks in advance for your input.
Joel Davidson
_______________________________________________
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org