We have a 4KW pv system installed and the local inspector wants to use this
as a test case so he is crossing all T's and dotting all I's.  Which I am
happy to help him out with training his other inspectors   We are running
into an issue on the module output wires.  USE-2 or PV rated is how the code
book reads.  The wire we have been using on these systems is DLO (diesel
locomotive) which carries the ratings of RHH and RHW-2, which seems to cross
with the USE-2.  Does anyone have any documentation showing this cross?  If
not, I guess I will be switching the wire to USE-2/RHW-2 because it needs to
go into conduit.

 

 

 

Mike

[EMAIL PROTECTED]

 

 

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to