We have a 4KW pv system installed and the local inspector wants to use this as a test case so he is crossing all T's and dotting all I's. Which I am happy to help him out with training his other inspectors We are running into an issue on the module output wires. USE-2 or PV rated is how the code book reads. The wire we have been using on these systems is DLO (diesel locomotive) which carries the ratings of RHH and RHW-2, which seems to cross with the USE-2. Does anyone have any documentation showing this cross? If not, I guess I will be switching the wire to USE-2/RHW-2 because it needs to go into conduit.
Mike [EMAIL PROTECTED]
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org