On Wed, Apr 29, 2015 at 6:16 AM, Dominic Evans <[email protected]> wrote:
> -----Robbie Gemmell <[email protected]> wrote: ----- > > There were some changes on master and the branch yesterday, so I have > > updated the commit lists again. The current categorised list of > > commits is now at: > > http://people.apache.org/~robbie/qpid/proton/0.9.1/git-cherry-pass3-c > > ategorised.txt > > > > As before, only the commits at the very bottom have been picked from > > master to the 0.9.x branch. All the previous commits mentioned in the > > file have not. If you want anything else included you need to say so, > > or do so. > > > > We are essentially waiting for PROTON-858 at this point, which there > > still seems to be a lot of discussion going on about. If we cant land > > it quickly with confidence I'd like to suggest possibly deferring it, > > as we can always do more releases. > > Thanks Robbie. > > Ongoing, is the plan that we should continue to backport cherry-picked > bugfix > commits from master and keep the 0.9.x series going for possible future > point > releases? > I think the SASL stuff should stabilize soon, and as that is the major delta, we could simply do a 0.10 when that happens. --Rafael
