-----Robbie Gemmell <[email protected]> wrote: ----- > There were some changes on master and the branch yesterday, so I have > updated the commit lists again. The current categorised list of > commits is now at: > http://people.apache.org/~robbie/qpid/proton/0.9.1/git-cherry-pass3-c > ategorised.txt > > As before, only the commits at the very bottom have been picked from > master to the 0.9.x branch. All the previous commits mentioned in the > file have not. If you want anything else included you need to say so, > or do so. > > We are essentially waiting for PROTON-858 at this point, which there > still seems to be a lot of discussion going on about. If we cant land > it quickly with confidence I'd like to suggest possibly deferring it, > as we can always do more releases.
Thanks Robbie. Ongoing, is the plan that we should continue to backport cherry-picked bugfix commits from master and keep the 0.9.x series going for possible future point releases? -- Unless stated otherwise above: IBM United Kingdom Limited - Registered in England and Wales with number 741598. Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6 3AU
