On 03/06/12 3:31 PM, Ondrej Ivanič wrote:
- one side completely down: Client should use switch to other side
transparently (Failover / High Availability)

what happens if the link between the sites is down and both sides decide they are master? then how do you put the pieces back together ?



--
john r pierce                            N 37, W 122
santa cruz ca                         mid-left coast



--
Sent via pgsql-general mailing list (pgsql-general@postgresql.org)
To make changes to your subscription:
http://www.postgresql.org/mailpref/pgsql-general

Reply via email to