I have a large table (billions of records) which has not been vacuum and 
bloated.
Vacuum scale factor was left at the default.

I ran a vacuum on a DEV system and it makes several passes (scanning 
heap/vacuuming indexes/vacumming heap) which take more than an hour each.
On a PROD system, I may have to kill the job midway.
Should I reduce the autovacuum_work_mem of my session? Currently 1GB
Does the work made in the current pass is lost when interrupted?
Correct me if I am not right, but vacuumed indexes and heap made by the current 
pass will go to disk, but the heap should be rescan on the next vacuum.
I guess that the visibility map is updated only at the end of each pass.

My best regards

Thank you


Jean-Marc Lessard
Administrateur de base de données / Database Administrator

[cid:image001.jpg@01D69D5F.64DB0EA0]

Ultra Electronics Forensic Technology Inc.
T +1 514 489 4247 x4164
www.ultra-forensictechnology.com<http://www.ultra-forensictechnology.com/>

Reply via email to