I have a large table (billions of records) which has not been vacuum and bloated. Vacuum scale factor was left at the default.
I ran a vacuum on a DEV system and it makes several passes (scanning heap/vacuuming indexes/vacumming heap) which take more than an hour each. On a PROD system, I may have to kill the job midway. Should I reduce the autovacuum_work_mem of my session? Currently 1GB Does the work made in the current pass is lost when interrupted? Correct me if I am not right, but vacuumed indexes and heap made by the current pass will go to disk, but the heap should be rescan on the next vacuum. I guess that the visibility map is updated only at the end of each pass. My best regards Thank you Jean-Marc Lessard Administrateur de base de données / Database Administrator [cid:image001.jpg@01D69D5F.64DB0EA0] Ultra Electronics Forensic Technology Inc. T +1 514 489 4247 x4164 www.ultra-forensictechnology.com<http://www.ultra-forensictechnology.com/>