Hi All,



Two action items from ZTE:

#1, Daisy4nfv PODs --> need to follow up on which 2 POD they are providing per 
TSC approva

2 PODs means: PODs used for CI

PODs for verify CI and Merge CI, which will be provided by the community

PODs for virtual and bare-metal deployment daily. ZTE has allocated zte-pod2 
for bare-metal and is setting up the virtual POD. It will be better if these 
PODs can be allocated by the community in the future




#2, Come up with ZTE POD information to understand which Fuel scenarios can be 
run on it

This action item is leaved by Fatih at the INFRA meeting on Oct 19 when I ask 
how to apply for CI PODs for ZTE PODs. It requires that ZTE PODs shall support 
as many senarios and we can.

ZTE currently run several senarios with Fuel installer including: 
os-odl_l2-nofeature-ha, os-nosdn-kvm-ha which are run daily. And ovs, odl_l3, 
no_sdn and others are also tested in ZTE PODs.









BR,



Julien






NFV Architect
Controller System Design Dept./Wireless Product R&D Institute/Wireless Product 
Operation





D206(D2028), R&D Building, ZTE Plaza, #889, Bibo RD, 
Pudong District, Shang Hai, P.R.China, 201203  
T: +86 21 68897791       M: +86 21 15317680806 
E: [email protected] 
www.zte.com.cn