I am using openvas 9 version (openvasmd 7.0.3) with database backend over
postgresql.

I have created approximately 2000 tasks that run on a monthly basis (in no
case do more than 5 tasks run simultaneously)

When I try to access by GSA or via OMP to openvasmd I get connection
errors, this makes it almost impossible to use GSA.
If I run openvasmd "--disable-scheduling" I can access correctly.

Analyzing the database, I identify a lot of activity related to scheduling.
This implies that there is a lot of locking time during.

Some idea of how to optimize the schedulle process ?

regards
-- 
Rodrigo Seguel
*Technology Director*



*Lerma 411 - CABATel: +54-11-4115-0315Cel: +54-911-5099-3988*

*Skype: seguelr *
*rseg...@activesec.biz <rseg...@activesec.biz>*
*www.activesec.biz* <http://www.activesec.biz/>
_______________________________________________
Openvas-discuss mailing list
Openvas-discuss@wald.intevation.org
https://lists.wald.intevation.org/cgi-bin/mailman/listinfo/openvas-discuss

Reply via email to