I am using openvas 9 version (openvasmd 7.0.3) with database backend over postgresql.
I have created approximately 2000 tasks that run on a monthly basis (in no case do more than 5 tasks run simultaneously) When I try to access by GSA or via OMP to openvasmd I get connection errors, this makes it almost impossible to use GSA. If I run openvasmd "--disable-scheduling" I can access correctly. Analyzing the database, I identify a lot of activity related to scheduling. This implies that there is a lot of locking time during. Some idea of how to optimize the schedulle process ? regards -- Rodrigo Seguel *Technology Director* *Lerma 411 - CABATel: +54-11-4115-0315Cel: +54-911-5099-3988* *Skype: seguelr * *rseg...@activesec.biz <rseg...@activesec.biz>* *www.activesec.biz* <http://www.activesec.biz/>
_______________________________________________ Openvas-discuss mailing list Openvas-discuss@wald.intevation.org https://lists.wald.intevation.org/cgi-bin/mailman/listinfo/openvas-discuss