On Mon, Jan 15, 2024 at 6:08 AM Mike Hammett <na...@ics-il.net> wrote:
> Let's say that hypothetically, a datacenter you're in had a cooling failure
> and escalated to an average of 120 degrees before mitigations started
> having an effect. What  should be expected in the aftermath?

Hi Mike,

A decade or so ago I maintained a computer room with a single air
conditioner because the boss wouldn't go for n+1. It failed in exactly
this manner several times. After the overheat was detected by the
monitoring system, it would be brought under control with a
combination of spot cooler and powering down to a minimal
configuration. But of course it takes time to get people there and set
up the mitigations, during which the heat continues to rise.

The main thing I noticed was a modest uptick in spinning drive
failures for the couple months that followed. If there was any other
consequence it was at a rate where I'd have had to be carefully
measuring before and after to detect it.

Regards,
Bill Herrin


-- 