José Matos wrote:

1.5 Features:
- Unicode / new encodings.
- Multiple windows.
- Change tracking
- Sessions

- What am I missing more?
- Outlook?
- Improved dialogs (some 1.4/qt3 dialogs are a PITA)?

How much time do the respective owners expect to need to have the new features in such a state that they can be presented to users without having them screaming away?
For change tracking, it will take about two weeks for basic operations and another two weeks for more complicated stuff (e.g. end-of-par handling). This is a conservative guess and I assume that I will be the only one working on CT.

On the other hand we need a quick release, or else all the flurry in the mailing list was useless, so I suggest a deadline for the alpha release of three weeks. That is Monday, 13 November 2006.
Alpha (not beta) in three weeks sounds good.

What about all thoses bugzilla entries? We should be able to drastically reduce the number of entries.

A: I am not Denmark but I will answer this. The role to follow here is the stable series. Not all fixes are welcome at all times, special at the last day or minute. :-)
Please be a bit more generous than we were for 1.4.0. When 1.4.0 was released (broken, slow, ...) there was a stack of about 50 patches. This should never happen again!

Textual changes (translator work) should be possible even at a very late stage.

Michael

PS: I like your email! Good points and a clear vision!