This was also in the Lincoln Squirrel:

Hanscom runway repaving will affect nearby Lincoln residents
<https://lincolnsquirrel.com/2023/03/hanscom-runway-repaving-will-affect-nearby-lincoln-residents/>
 (March 27, 2023)


Alice Waugh

Editor, The Lincoln Squirrel <https://www.lincolnsquirrel.com> and The
Lincoln Chipmunk <http://chipmunk.lincolnsquirrel.com>

[email protected]

617-710-5542 (mobile)

www.watusiwords.com


On Thu, Jun 8, 2023 at 6:57 AM Christopher Eliot <[email protected]> wrote:

> I am hoping someone might have access to information about the Sarain
> gate/Hanscom drive roadwork. I can’t seem to find anything on the web other
> than the initial Hansoom AFB news report from Nov 2022. What is the
> projected completion date.  Will the new traffic pattern be permanent?
> Will the prior traffic pattern return or something in between?
>
> Thank you
> Carol
> Virginia Rd Resident,
>
>
>
> The project will take place over a 37 day period, but work will only be
> done during the day Monday-Friday in that period (20 working days).
>
> More information is available in Bedford Citizen articles.
>
>
> https://thebedfordcitizen.org/2023/05/work-on-lincoln-side-of-short-hanscom-runway-begins-june-5/
>
>
> https://thebedfordcitizen.org/2023/03/bedford-escapes-most-of-this-summers-runway-resurfacing/
>
>
> Here is the full description from the last Massport projects report.
>
> July 2022: Runway 5-23 south of Runway 11-29 is scheduled for
> rehabilitation during summer of 2023. Additional project information will
> be available once the project team has been selected. January 2023: The
> advertising date is February 15th with scheduled bid opening on March 8th.
> The project is estimated to begin on June 1 and take approximately 35 days.
> February 2023: The bid was posted on February 15th and closes on March 8.
> The project team will update HFAC at the March 2023 meeting. March 2023:
> The project is anticipated to begin June 1 and there will be a full closure
> of the runway for 37 days. April 2023: Massport will issue a press release
> for the project which will include contact information. Scheduled updates
> will likely appear on the Massport website. A link to the information will
> be provided to HFAC when it is available. May 2023: Project is expected
> to begin on June 5. Concerns can be made via the noise line (781) 869-8050
> --
> The LincolnTalk mailing list.
> To post, send mail to [email protected].
> Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/
> .
> Change your subscription settings at
> https://pairlist9.pair.net/mailman/listinfo/lincoln.
>
>
-- 
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at 
https://pairlist9.pair.net/mailman/listinfo/lincoln.

Reply via email to