Anyone have any ballpark nunbers for a building owner prewire like this?

8'-4" drop ceiling, electrician will stub out (3/4" conduit) single gang 
box at each location, plenum cable requirement.

quote would include:

14000 ft of cat 5 plenum cable
80 single gang plates, each with two cat 5 jacks (data 1 & data 2 - 160 
jacks).
other end terminated to two customer provided rack mounted cat5 (110) 96 
jack fields-
(eighty "data1" jacks to one, and eighty "data2" jacks to other)

don't waste time on this, but rounded to the thousand should make a 
guess easier..

thanks folks,

-larry / dallas  