Hi Guys, well I feel I've turned the corner and am on the home straight. Flipped KRZ back onto her wheels after a couple of months modifying the belly and adding flaps to the stub wings (see my blog). While the flaps are not 100% done they are close enough for now and I needed to have it right side up to start the remaining big ticket items.
I've launched into the final shaping of the engine cowl and will soon pull a mould off the currrrvy plug I've been making (history of this is also on the blog). My current trade is as a scheduler and my wife shamed me into doing a schedule for the KR. If all goes according to plans I should be Test flying next June. Most of the things left to do are already 80% done . just need finishing off. Things still to do: * Finish the Cowl and plenums * Finish the Fwd Deck (including a locker instead of a header tank * Finish the Turtle Deck * Finish the Wings * Build the Instrument panel * Finish the fuel & elec systems Paul Smith Brisbane, AUSTRALIA pk.sm...@bigpond.net.au http://kr2spacemodulator.blogspot.com/