Today, with the new oil cooler installed, I conducted the second break-in
run for the new rings.  Everything went well, the oil stayed below 180 for
long enough to get in a good run-up.  I still have a cool side and a hot
side, but I think much of that is due to running with the cowling off.  The
really good news is that the rings appear to be seating and the #3 cylinder
is catching up on the rest, in compression, as they are all almost the same.
 I am going to try to remember to get a compression test gauge so I can
actually get the numbers, before I fly it again.

I think this seals the deal for the new intake manifold, so tomorrow, I will
begin modifying the baffle and may be able to get it installed, as there is
not much to do for that, then I have to modify the top of my cowling to make
room for the VW intake castings.

So I am thinking it may take another two weeks to get back in the air.

See N64KR at http://KRBuilder.org - Then click on the pics 
See you at the 2007 - KR Gathering
There is a time for building and a time for FLYING and the time for Flying
has begun.
Daniel R. Heath - Lexington, SC

Reply via email to