I'm looking for example to replace existing Multi Configuration Job with Jenkinsfile that handles X Y axis mapping. Also needs to support Matrix Configuration (so which X:Y mappings to do) and Slave label to run that job on. In the multi configuration job even if called from pipeline on node X... when it runs the child jobs it runs them on random nodes without a Slave Axis.
-- You received this message because you are subscribed to the Google Groups "Jenkins Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-users+unsubscr...@googlegroups.com. To view this discussion on the web visit https://groups.google.com/d/msgid/jenkinsci-users/ea3da699-0199-42f4-b3cc-5aba19a370b7%40googlegroups.com. For more options, visit https://groups.google.com/d/optout.