I have a matrix build with touchstone builds, multiple configurations, 
etc.  I have a step which should be the *last* step in the matrix (not a 
triggered parameterized build, etc) and can't find a way to force the job 
to run that last step last.
I've tried using the "Run each configuration sequentially" option, but it 
appears to only force the jobs to run *serially*.

Anyone have any suggestions on what I can do to get this desired 
functionality?

Thanks in advance,

Adam

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to jenkinsci-users+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to