[ 
https://issues.apache.org/jira/browse/HIVE-26770?focusedWorklogId=829564&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-829564
 ]

ASF GitHub Bot logged work on HIVE-26770:
-----------------------------------------

                Author: ASF GitHub Bot
            Created on: 29/Nov/22 07:39
            Start Date: 29/Nov/22 07:39
    Worklog Time Spent: 10m 
      Work Description: deniskuzZ commented on code in PR #3803:
URL: https://github.com/apache/hive/pull/3803#discussion_r1034392246


##########
ql/src/java/org/apache/hadoop/hive/ql/txn/compactor/Worker.java:
##########
@@ -123,8 +126,12 @@ public void run() {
           } catch (InterruptedException e) {
           }
         }
-        LOG.info("Worker thread finished one loop.");
+        Instant loopEndTime = Instant.now();
+        Duration timeElapsed = Duration.between(loopStartTime, loopEndTime);

Review Comment:
   why not simply `long elapsedTime = System.currentTimeMillis() - startedAt;`





Issue Time Tracking
-------------------

    Worklog Id:     (was: 829564)
    Time Spent: 2.5h  (was: 2h 20m)

> Make "end of loop" compaction logs appear more selectively
> ----------------------------------------------------------
>
>                 Key: HIVE-26770
>                 URL: https://issues.apache.org/jira/browse/HIVE-26770
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Akshat Mathur
>            Assignee: Akshat Mathur
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 2.5h
>  Remaining Estimate: 0h
>
> Currently Initiator, Worker, and Cleaner threads log something like "finished 
> one loop" on INFO level.
> This is useful to figure out if one of these threads is taking too long to 
> finish a loop, but expensive in general.
>  
> Suggested Time: 20mins
> Logging this should be changed in the following way
>  # If loop finished within a predefined amount of time, level should be DEBUG 
> and message should look like: *Initiator loop took \{ellapsedTime} seconds to 
> finish.*
>  # If loop ran longer than this predefined amount, level should be WARN and 
> message should look like: *Possible Initiator slowdown, loop took 
> \{ellapsedTime} seconds to finish.*



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to