[ 
https://issues.apache.org/jira/browse/HIVE-11779?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14745528#comment-14745528
 ] 

Hive QA commented on HIVE-11779:
--------------------------------



{color:red}Overall{color}: -1 at least one tests failed

Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12755946/HIVE-11779.4-beeline-cli.patch

{color:red}ERROR:{color} -1 due to 5 failed/errored test(s), 9446 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver_describe_pretty
org.apache.hadoop.hive.cli.TestSparkCliDriver.testCliDriver_auto_sortmerge_join_2
org.apache.hadoop.hive.cli.TestSparkCliDriver.testCliDriver_auto_sortmerge_join_8
org.apache.hive.hcatalog.api.TestHCatClient.testTableSchemaPropagation
org.apache.hive.hcatalog.streaming.TestStreaming.testEndpointConnection
{noformat}

Test results: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-BEELINE-Build/40/testReport
Console output: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-BEELINE-Build/40/console
Test logs: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-BEELINE-Build-40/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 5 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12755946 - PreCommit-HIVE-BEELINE-Build

> Beeline-cli: Format  the output  of describe pretty table command  in new 
> CLI[beeline-cli branch]
> -------------------------------------------------------------------------------------------------
>
>                 Key: HIVE-11779
>                 URL: https://issues.apache.org/jira/browse/HIVE-11779
>             Project: Hive
>          Issue Type: Task
>            Reporter: Ke Jia
>            Assignee: Ke Jia
>         Attachments: HIVE-11779.1-beeline-cli.patch, 
> HIVE-11779.2-beeline-cli.patch, HIVE-11779.3-beeline-cli.patch, 
> HIVE-11779.4-beeline-cli.patch
>
>
> In the old CLI, it uses "hive.cli.pretty.output.num.cols" from the hive 
> configuration to use the number of columns when formatting output generated 
> by the DESCRIBE PRETTY table_name command . We need to support the previous 
> configuration using beeline functionality.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to