Go to ISPF 3.4 and see what volume SYS1,LINKLIB is on.   Then go look at 
the SMP/E job you ran and see if SYS1.LINKLIB is listed as being on the 
same volume. If it is, you updated modules in the in use SYS1.LINKLIB. 

You should have a complete copy of the system volume and possibly a second 
volume. Your SMP setup should have DDDEFs that point to this volume that 
is used for maintenance. Then when you are ready with the maintenance, you 
schedule an IPL and IPL from the new pack. That way you have the original 
pack to fall back on if there are problems. 


Thank You,

Paul Strauss


----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to