I think the proposal is missing the version numbering that will be used,
like, let's say the releases are x.y.z, is y increased? Or should the
numbering going to be switched to something like yyyy.mm?

Also, should the GCD document what happens if something goes horribly
wrong after the release is made, ie. a new minor release created to
mitigate the issue?

Steve George <st...@futurile.net> writes:

> Hi all,
>
> It's been ~2.5 years since the last Guix release, which led me to think we 
> should do another one! Initially, I was just going to see if anyone wanted to 
> create a release project. But, before I knew it I was writing a GCD! ...
>
> Below you'll find a proposal for moving to a regular release cycle.
>
> Thanks to Andreas Enge, Ludovic Courtès and Efraim Flashner for their initial 
> comments and insights. They've agreed to sponsor it - which means they agree 
> with the general direction (but not necessarily with all aspects), and will 
> help to 'garden' the discussion to move us towards a consensus on whether 
> it's a good proposal.
>
> This is a **draft** submission so I look forward to your consideration of it, 
> thoughts and comments.
>
> Thanks,
>
> Steve / Futurile
> title: Regular and efficient releases
> id: 005
> status: draft
> discussion: https://issues.guix.gnu.org/78332
> authors: Steve George
> sponsors: Andreas Enge, Ludovic Courtès, Efraim Flashner
> date: <date when the discussion period starts>
> SPDX-License-Identifier: CC-BY-SA-4.0 OR GFDL-1.3-no-invariants-or-later
> ---
>
> # Summary
>
> Guix doesn't have regular release cycle which has led to infrequent new
> releases. Sporadic releases are detrimental for our users, contributors and
> the project.  This GCD proposes we implement an annual release cadence and
> simplify the release process to make releases easier.
>
> The project currently releases new versions of Guix on an ad hoc frequency.
> The 1.4.0 release happened in December 2022 [^1], which is almost 2.5 years
> ago, at the time of writing.
>
> The weaknesses in this release strategy are:
>
> 1. No clarity on when the next Guix release is.
> 2. Releases are complex and toil for developers.
> 3. Rolling updates aren't suitable for all users.
>
> This GCD proposes the following combined solution:
>
> 1. Regular releases: switch to a time-based release of Guix every year.
> 2. Efficient releases: use *package sets* and *supported architectures* to
> reduce the scope of work required to create a Guix release.
>
> The benefits will be:
>
> 1. New installations of Guix will be better because installation media and
>    manuals will be up to date, and the initial 'guix pull' will be faster.

The initial pull won't be faster, the pull is so slow because there is
no checkout and no commits checked for auth, not because the iso is so
old. No matter the age of iso, the full clone has to be made and authenticated.
If there was a checkout in the cache, it would be faster, the more up to
date it is, the faster the pull is. Additionally what would greatly
improve the experience is if this checkout has been copied to the
installed system.
But that's not related to the releases themselves, but to how the iso is made.

> 2. Package installation will improve for all users.  Packages will be 
> ungrafted
>    during each release cycle.
> 3. Package quality will improve for all users, because regular releases will
>    provide a cadence for focusing on our quality.
> 4. A regular cadence for promoting the project to potential users.  Helping us
>    to inform more people about the benefits of using GNU Guix!
> 5. A regular release cycle is a rallying point for our contributors giving 
> them a
>    consistent calendar of when to focus on releases versus other hacking.
>
> Adding a slower-moving branch akin to Nix's stable could be an eventual goal 
> as
> it would increase Guix's suitability for some users and use-cases [^2].  
> However,
> this GCD only sets out to implement regular releases which is a substantial
> change that would be a big improvement for our users.
>
>
> # Motivation
>
> Releases are important for any Free Software project because they update the
> user experience and are a focal point for excitement [^3].  Regular releases
> help us to improve the quality of our software by bringing focus, and
> exercising regular usage scenarios (e.g. testing the installer).
>
> The majority of distributions follow time-based releases, six months is a
> common cycle time.  For further comparison see the research on the
> [release strategies of distributions] 
> (https://codeberg.org/futurile/guix-org/src/branch/master/release-mgmt)
> . A summary is:
>
> - NixOS: releases every six months (May/November), both rolling release and
> slower stable branch.
> - OpenSUSE: rolling release, slow-roll release and fixed releases.
> - Ubuntu: every six months, with 9 months maintenance. LTS releases every
> 2 years.
> - Debian: Every 2 years (not time fixed), with about six months of package
> updates freeze before the release while bugs are ironed out.
>
> As a rolling release Guix immediately provides the latest improvements to
> users.  Consequently, it could be argued that releases are unnecessary.
> However, they provide a focal point for the project to undertake additional
> testing and stabilisation across the repository.  They also ensure we update
> installation media, documentation, themes and web site.

I think releases are also needed for other distro package managers to
update. While users are encouraged to use the guix-install.sh script,
some will end up installing with their system's package manager. Maybe
it would be good to mention that?

>
> A specific issue caused by irregular releases is that new users/installs face 
> a
> significant first "guix pull". This provides a poor initial user experience,
> and in some cases may even deter users [^4]. Additionally, it requires the
> project to keep old substitutes on our servers.
>
> Regular releases are also good for casual users because they provide an
> opportunity for us to promote new features and improvements.  For prospective
> users promotional activity about the release means they are more likely to 
> hear
> about capabilities that will attract them to experiment with Guix.
>
> Many desktop distributions release every six months to align with the major
> desktop environments (GNOME/KDE) who release two or three times a year. This 
> is
> why Nix (May/November) and Ubuntu (April/October) align their releases.
>
> Since Guix is used [extensively as a desktop] 
> (https://guix.gnu.org/en/blog/2025/guix-user-and-contributor-survey-2024-the-results-part-1/)
> it would make sense to align with these upstream releases.  However, given 
> that
> Guix is a volunteer project that doesn't have the practise of releasing it's
> unrealistic to move to two releases a year. Something along these lines could
> be a future goal [^5].
>
> This GCD proposes an annual release cycle, with releases **in May**.

Is May smart if GNOME is to be targeted? I think NixOS really struggles
to make the GNOME updates in time. And there is less people working on
it on Guix as far as I know. Gnome is like two releases back? If we
wanted to include GNOME, wouldn't June make more sense to give an extra month?

Or for a better approach: is there a specific list of packages that
would be targeted so it can be used for the decision?

>
> To move onto this cycle the first release would be a little later: aiming for
> the **November of 2025**, with a short cycle to release in May 2026.
>
>
> ## Package Sets
>
> There are currently over 30,000 packages in the archive, it's unrealistic for
> all packages to receive the same amount of QA effort for a release.
>
> Many other distributions focus attention on the critical parts of their
> repository by identifying those packages that are required for a particular
> user-case.  For example, Arch Linux limits their efforts to a specific
> repository (called "main").  Ubuntu identifies various seeds for specific
> use-cases which determines their maintained packages; other packages outside
> these sets do not receive security updates.
>
> Guix is both a package manager that can be hosted on other Linux 
> distributions,
> and a Linux distribution.  Limiting the range of packages that receive 
> attention
> is consequently more complicated. Guix already has manifests to track which
> packages are used by [Guix System's 
> installer](https://git.savannah.gnu.org/cgit/guix.git/tree/etc/manifests/release.scm)
> , so this proposal extends that concept.
>
> For this proposal Guix would identify key package sets which would receive the
> most attention for QA'ing a release.
>
> The package sets would be:
>
> * minimal: packages required to boot and install a minimal Guix or Guix System
> install.  This would include the guix daemon, kernels, boot loaders,
> file-systems and minimal utilities.
> * standard: packages that create a core installation for all other uses.
> * desktop: provides the packages necessary for a desktop.  This would include
> things like X11/Wayland, desktop environments, key applications and themes.
> * server: provides packages and services for a server.  This would include
> standard server packages and services.
> * hosted: provides packages and services which are necessary in hosted usage.
>
> Guix would still make all packages and services part of a release (the entire
> archive), but only those in the `package sets` could block a release due to a
> significant bug.  The goal would be for this to be as small a set of packages
> as reasonably possible.  It would mean that developers could focus on the
> critical packages and services during a release.  As an example, this would
> mean that a major issue in the Linux kernel could block a release, but not an
> issue in a game.
>
>
> ## Platforms and Architecture tiers
>
> Guix is built and maintained on multiple different architectures, and two
> kernels (Linux, GNU Hurd).  As the goal of the project is to maximise user
> freedom this variety is significant and is a key motivator for developers.
>
> However, with limited resources (developer and CI) we want to make it as
> efficient as possible to create a release.  The more toil involved in a 
> release
> the less likely developers are to work on it.
>
> The [2025 Guix User 
> Survey](https://guix.gnu.org/en/blog/2025/guix-user-and-contributor-survey-2024-the-results-part-2/)
> showed that 98% of users were on x86_64 and 19% on AArch64.  Consequently, the
> proposal is the following tiers:
>
> - Primary architectures:
>   - Architectures: x86_64, AArch64
>   - Kernel: Linux
>   - Coverage: all packages and services that are not explicitly platform
>     specific must work to be included in the archive.
>   - Package status: package updates should build for this architecture.  If a
>     package update is broken it must not be pushed to users (e.g. master).
>   - Security: all packages that are maintained upstream receive updates
>
> - Alternative architectures
>   - Architectures: all others
>   - Kernel: Linux, Hurd
>   - Coverage: all packages and services that are not explicitly platform
>     specific may build
>   - Package status: package updates should work for this architecture.
>     Updates that do not build for this architecure, but do build for a primary
>     architecture may be pushed to users.
>   - Security: no commitment to providing security updates for this 
> architecture.
>
> Packages or services that do not build for the Primary architectures as part 
> of
> a release would be removed from the archive using Guix's deprecation policy.
>
>
> ## Release artifacts
>
> Using the primary architecture tier and the package sets would involve 
> creating
> the following release artifacts:
>
> - GNU Guix System ISO image
> - GNU Guix System QCOW2 image
> - GNU Guix installer
>
> Again in an effort to reduce developer toil, additional release artifacts 
> could
> be created but would not be part of the formal release testing and errors 
> would
> not block a release.
>
>
> ## Release team and project
>
> A regular release cycle should galvanise all Guix developers to work on our
> releases.  But, to ensure there are sufficient people involved a call will be
> put out to create a specific release team for each release project.  We would
> expect the final release team to be around four-six members. The release team
> will work together to fix issues and test the various release artifacts. The
> expectation is that the release projects will be as short as possible, around
> a 12 week commitment with each team member having a few hours a week to take
> part.
>
> To manage the release it's proposed that each release will have a Release 
> Manager
> role. The role of the Release Manager is to: 
>
> - co-ordinate the release project
> - communicate with the release team and wider developers status and blockers
> - arbitrate changes to release blocking bugs, package sets and release
>   artifacts
> - influence and assist teams to resolve problems
> - define the release artifacts and create them
> - encourage and excite **everyone to create and test the release**
>
> The Release Management role is likely to require the most effort, so it will
> be rotated and consist of two people from the release team.  For each release
> there would be a primary person and a secondary person in the role.  The
> primary person is new to the role.  The secondary person has previously done 
> it
> and is mentoring the new person.  The impact of this is that each new release
> manager is agreeing to take responsibility during two release cycles.
> This system is modelled on the [Nix release 
> management](https://codeberg.org/futurile/guix-org/src/branch/master/release-mgmt/nix-release-mgmt.md)
> approach.
>
> One of the release team will take on the role of Release Advocate [^6].  They
> will take responsibility for preparing the release announcement and 
> coordinating the creation of content to promote the new release (e.g. web 
> site)
> This role can be done by any member of the Guix community who has sufficient
> interest.
>
> The final release team is:
>
> - a new Release Manager
> - a returning Release Manager
> - up to 4 other members, one of whom acts as the Release Advocate
>
> The Release Managers of each release will create and communicate a release
> project plan setting out the stages and dates for each stage.  To try and
> galvanise the Guix development team to focus on the release it's envisioned
> that a release project will be about 12 weeks. See Appendix 1: Release Project
> Time-line for an example.
>
> In order to improve knowledge transfer and reduce the toil of doing releases
> the Release Managers for a release will document the release process.  There 
> is
> inspiration for this in [NixOS's release 
> wiki](https://nixos.github.io/release-wiki/Home.html)
> and we already have detailed [release 
> documentation](https://git.savannah.gnu.org/cgit/guix/maintenance.git/tree/doc/release.org)
> .
>
>
> # Cost of Reverting
>
> If regular releases were not successful then the project would switch back to
> irregular releases.  There would be no impact for exiting users as they will
> be tracking the rolling release's master branch.
>
> If the project is able to successfully undertake regular releases then over
> time it may be possible to undertake full releases every six months or some
> other release cadence.
>
>
> # Drawbacks and open issues
>
> There's no particular drawback to attempting regular release.  It should be
> noted that the project is entirely dependent on volunteers so it may be that
> contributors don't have enough time available to achieve regular releases.  If
> that's the case we would revert back to irregular releases.
>
> There are various improvements that could be made to this process over time,
> but no known issues.
>
>
> # Appendix 1: Release Project Time-line
>
> To illustrate the major steps of a release project this is a rough time-line.
> The aim is for a 12 week active release project, with the first one using 16
> weeks in total to give teams time to prepare.
>
> The current outline builds from our current [release 
> document](https://git.savannah.gnu.org/cgit/guix/maintenance.git/tree/doc/release.org)
>
> | Week of Project | Event |
> | --- | --- |
> | -5 | Nominate a release team |
> | -4 | Notify teams of upcoming release |
> | 01 | Release project start |
> | 04 | Toolchain and transition freeze |
> | 05 | Package set finalisation |
> | 06 | Initial testing |
> | 08 | Updates freeze |
> | 08 | Breaking changes to staging |
> | 08 | Ungraft master branch |
> | 09 | Bugs and documentation focus |
> | 09 | Branch and tag release branch |
> | 09 | Testing and hard freeze |
> | 10 | Release candidate |
> | 12 | Final release |
> | 13 | Staging merged to master |
> | 14 | Release retrospective |
> | 15+| Relax - it's done! |
>
> ### 1. Nominate a release team
> Nominate a release team with two Release Managers (1 is the previous RM), and
> up to 4 other people who will work on the release. Put out a call for a 
> Release
> Advocate who can be anyone in the Guix community who's willing.
>
> ### 2. Notify teams of upcoming release
> Make sure all teams are aware of the upcoming release.  This gives them 4 
> weeks
> to undertake any large transitions or major changes.
>
> ### 3. Release project start
> Start the project with weekly updates to guix-dev and regular meetings of the
> release team.  Encourage participation in testing and identifying bugs from
> the community.
>
> ### 4. Toolchain and transition freeze
> No major changes to toolchains (e.g. gcc-toolchain, rust-1.xx) or runtimes
> (e.g. java).  There should be no changes that will cause major transitions.

So total of 9 week freeze? Isn't that too long for users to not receive
those updates if they were ready?

I think that should be at least mentioned in the drawbacks, even if most
people won't consider it a major drawback, it sounds like a drawback to me.

But I suppose it will still be possible to commit those changes, you
just won't be able to switch the default toolchain. Though Rust, Python
etc. currently don't really support more than one version for building
other packages, at least not well.

>
> Debian defines a transition as one where a change in one package causes 
> changes
> in another, the most common being a library.  This isn't suitable for Guix 
> since
> any change in an input causes a change in another package.  Nonetheless, any
> change that alters a significant number of packages should be carefully
> considered and updates that cause other packages to break should be rejected.
>
> No alterations to the Guix daemon or modules are accepted after this point.

What modules exactly, all? And what kind of alterations? I suppose some
changes will still be possible, like adding a new package or service,
no?
I think it doesn't make sense to completely block alterations to the
daemon, ie. if there was a bug or security issue.

> Packages and services in the 'minimal' package set should not be altered.
>
> ### 5. Package set finalisation
> Specify the package sets for this release.  Identify all packages and their
> inputs so that a full manifest for the release is created.
>
> ### 6. Initial testing
> An initial testing sprint to look at packages, services, install media and
> upgrade testing. This should identify:
>
> * packages or services that may need to be removed because they fail on a
>   primary architecture

So hypothetically, if a package/service worked on non-primary
architecture or one primary architecture, but not the other, it will be
removed, completely? That doesn't sound right. Am I misunderstanding
here? Where is the package removed from, the guix repository or just
from the package set that should be passing for the release?
Either way, like this it conflicts with the earlier 'packages and
services in the minimal package set should not be altered', so I think
it should be mentioned it doesn't apply to those packages.

> * packages and services in the package sets install and can be used
> * installation artifacts can be created and used
> * example system definitions can be used
> * system upgrades
>
> A build failure of a package or service will result in it being identified for
> removal.  A build failure of a package or service that's in a package set will
> be marked as a blocker for the release.
>
> ### 7. Updates freeze
> Major package updates are frozen on 'master' as the focus is on fixing any
> blocking packages.  Security updates still go to 'master'.

So 5 weeeks. (I am counting the retrospective week btw)
Maybe the text should mention how many weeks the freeze is for so it's
easier to orient? It seems important to me.

>
> ### 8. Breaking changes to staging
> To avoid a period of time where teams can't commit breaking changes, these are
> sent to a new 'staging' branch, rather than directly to master.  The master
> branch slows down from this week.
>
> This concept comes from the Nix project where they flow big changes into a
> staging branch while they do release stabilisation to prevent big flows of
> breaking changes into master which broke one of their releases [^7].

Nix doesn't use staging because of that, they use it always, mostly
because the CI cannot build the whole package set. They don't use
grafts, so there are world rebuilds like two times a month, when the
staging merges to master, and they do that only if staging has already
been built so that people get substitutes.

I think this is a misunderstanding, the linked text states that breaking
changes shouldn't be merged to staging branch, not to master branch. In
turn, it also isn't merged to master branch, because staging is merged
there, quite regularly. This can be most easily seen from the table they
have with affected branches mentioned.

So while I agree with the general motion that changes should be merged
somewhere else, it's not right to state Nix does this.

By the way, since you linked it already, citing their drawbacks

Citing from [^7]:
> Breaking changes to Release Critical Packages will have to wait a
> maximum of 4 weeks to be merged into staging. Other breaking changes
> targeting staging will have to wait a maximum of 2 weeks to be merged.
> Staging-next iterations will follow a 1 week development cycle during
> the release timeline. Breaking changes to Release Critical Packages
> will not appear in master for around 7 weeks (4 weeks being disallowed
> to be merged to staging, 1 week for last staging-next during ZHF, ~2
> weeks average in staging-next). Pull requests which are able to target
> master will not be interrupted d

So they do have 7 week period to not merge anything critical to master,
that's less than what is proposed here. I think it should be kept to as
low number as reasonably possible. That probably have to be analyzed,
and I think the longer time from bigger projects, like GNOME, the more
time to prepare to it even before the release schedule kicks in.

Back to Steve's message:
>
> Team branches can still be folded into the release branch as long as changes 
> are
> minor package upgrades.
>
> ### 9. Ungraft master branch
> Guix master is ungrafted to minimise the difference with users of the release
> initial 'guix pull' experience.

Could you clarify what this means?

>
> ### 10. Bugs and documentation focus
> The master branch should be quiet at this point as everyone should focus on
> testing and resolving any bugs.  New documentation can also be done.
>
> ### 11. Branch and tag release branch
> The master branch is tagged and a new release branch is created.
>
> * master branch: security only.
> * release branch: security updates as normal. Only RC blocking bugs.
>
> Only security updates go to the master branch from week 9->13.  All other
> changes stay in a team branch or go to the `staging` branch. The focus on the
> release branch is to stabilise so only RC bugs should be pushed.

Am I reading correctly, no updates whatsoever for 4/5 weeks!! :O
Shouldn't this at least only affect the packages in the package sets?
Even so, feels like too long.

>
> ### 12. Testing and Hard Freeze
> RC bugs and issues should be solved for the release branch.
>
> Only changes that will fix a non-building package, or a bug in a package are
> allowed.  Ideally avoid new upstream versions, but it's acceptable to use a 
> new
> minor upstream version to solve a bug.
>
> Any non-building packages are removed.

>
> ### 13. Release candidate
> Release artifacts are created for the release candidate.  There's a final 2
> weeks of testing with these artifacts.  If there are no release blocking bugs
> discovered then the releas uses these artifacts.  If bugs are found/fixed then
> release artifacts are regenerated as needed.
>
> ### 14. Final release
> Final release is announced and new release artifacts are published.
>
> ### 15. Staging merged to master
> If there were any breaking changes placed onto the `staging` branch then these
> can be merged into the `master` branch at this point.  The master branch then
> continues as normal.
>
> ### 16. Release retrospective
> A retrospective is undertaken by the release team to understand how the 
> release
> process can be improved to make it more reliable for users and 
> easier/efficient
> for developers.
>
> ### 17. Relax!
> The release has been cut, everyone is now excited, and hopefully all is well.
> Take some time off from release work!  There's some time built-in here to
> relax and get back to other hacking before it's time to start again with the
> next release.
>
> ---
>
> [^1]: https://guix.gnu.org/en/blog/2022/gnu-guix-1.4.0-released/
>
> [^2]: Examples of distributions that have cadences for different users and 
> screnarios
>       are Nix's stable branch, OpenSUSE's SlowRoll branch and Ubuntu's LTS
>       (Long Term Support) releases.
>
> [^3]: the aspect of creating news and excitement for casual users is 
> well-known
>       in the FOSS community. An example from 
>       [GNOME's earlier 
> days](https://mail.gnome.org/archives/gnome-hackers/2002-June/msg00041.html).
>
> [^4]: GuixDays 2025 release discussion brought up examples of Guix not being
>       used to teach users because the initial pull was so slow that the
>       teaching session would have completed before 'guix pull' would finish.
>       We know guix pull being slow was identified by users as a challenge.
>
> [^5]: OpenSuse has a [SlowRoll 
> branch](https://en.opensuse.org/Portal:Slowroll)
>       where they release a smaller set of package updates on a monthly basis.
>       This is an interesting innovation as it allows users to still benefit 
> from
>       a rolling release but at a slower rate of change (fewer regressions).
>       They are also not dropping too far behind the rolling release, so 
> there's
>       not as much maintenance for OpenSUSE developers dealing with an out of
>       date release branch and having to backport software.
>
> [^6]: Nix has the concept of a [Release 
> Editor](https://nixos.github.io/release-wiki/Release-Editors.html)
>       who is responsible for improving the legibility of the release notes.  
> Our
>       version extends the idea to make sure other artifacts and activities 
> that
>       promote the release happen.
>
> [^7]: 
> https://github.com/NixOS/rfcs/blob/master/rfcs/0085-nixos-release-stablization.md

Regards
Rutherther

Reply via email to