Berin Lautenbach wrote:
Leo Simons wrote:
IMHO, as long as a project still requires a "point man" (or as long as the PMC still requires such a person in order to be kept up to date of what is happening in the directory project), the project is not ready for graduation.
Absolutely! A good test of maturity. If the mentor is doing absolutely nothing and things are going well, then there is no need for a mentor and quite possibly no need for the project to be in incubation anymore.
Exactly!
Cheers, Steve.
--