Status ====== The trunk is in Stage 1, which, if we follow roughly the 4.6 release schedule, should end around end of October. At this point I'd like to gather the status of the various development branches that haven't been merged into trunk yet and whether it is possible to merge them with such a schedule or whether e.g. a two weeks delay would help them. In particular, is transactional-memory branch mergeable within a month and half, at least some parts of cxx-mem-model branch, bitfield lowering? What is the status of lra, reload-2a, pph, cilkplus, gupc (I assume at least some of these are 4.8+ material)?
Quality Data ============ Priority # Change from Last Report -------- --- ----------------------- P1 6 + 6 P2 95 + 10 P3 59 + 56 -------- --- ----------------------- Total 160 + 72 Previous Report =============== http://gcc.gnu.org/ml/gcc/2011-03/msg00178.html The next status report will be sent by Joseph.