Hi, I was wondering if it is possible to create a dependency between 2 insns through a specific scheduler hook (maybe through TARGET_SCHED_DEPENDENCIES_EVALUATION_HOOK) even though the insns are not really dependent (not really read-after-write etc.). If it is possible, what is the best way to do it?
Thanks, Tomer