I thought folks would like to hear the results of some of my testing.

1/2 inch smashed copper pipe, 200 Amps for a 2S2P pack of 8 Ahr "P" (for 
Power") Headway cells: Things stayed cool.

1/2 inch by 0.02 inch braided strap with smashed copper pipe at connections: 5 
F rise in 90 seconds at 200 A

1/2 inch by 0.01 inch Al: 200A, 80F to 200F in about 15 seconds! This was done 
in the oxidized state.

1/2 inch by 0.01 inch Al: 200A, 80F to 200F in about 15 seconds! This was done 
with sanding and immediate Noalox.

1.75 inch by 0.02 inch Al: 200A, 80F to 160F in about 30 seconds.

The Al performed way worse than theory predicted, then I think I figured it 
out. Al roof flashing from Home Depot is apparently not a very conductive alloy 
of Al. I'd guess better Al would perform much closer to Cu.
_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
http://lists.evdl.org/listinfo.cgi/ev-evdl.org
For EV drag racing discussion, please use NEDRA 
(http://groups.yahoo.com/group/NEDRA)

Reply via email to