Hi All,

When I was a young engineer at AT&T Bell Labs, about 50 years ago, my designs 
had to have an amplitude tolerance of +/- 1/10th dB to meet requirements (even 
without computer simulation). So when I came across EMC topics later on I was 
initially surprised to see tolerances like +/-2 dB or more. To me this means 
either the engineers do not understand the designs, or (and I think this is the 
case) there are too many uncontrolled variables to allow a narrower tolerance. 
I have seen differences of 9 dB on the same measurement on an EUT and comb 
generator by different accredited labs!

I personally think that Silicon Valley is the best place to do EMC testing 
because there are so many labs, very close to each other, there that they are 
driven to be very close to each other in measurement results (otherwise the 
outliers would go out of business, quickly). Given a choice, I would test in 
Silicon Valley.

On a separate topic, I am 77 years old but have the physical and mental 
capabilities of a 30 year old from my 50 year experiment to slow the aging 
process, which has proven to be a success for me. We often unofficially discus 
this after my seminars are finished for the day. On a recent seminar, the 
attendees kept me over for two hours after the seminar, questioning me and 
taking notes. This is not part of the seminar, but a significant freebie 
available to the attendees.

I run 3,000+ miles per year, even on 120°F days in the Southern Nevada desert. 
Such heat does not even feel stressful to me!  I design my own hydration. I 
designed my own nutrition and supplement plans as well. I never get sick, and 
am immune from sunburn from one of my supplements, astaxanthin. This comes from 
applying science and engineering to my mind and body. I have read many, many 
thousands of pages of medical research in my life and make use of it!

Another topic, my classes are focused on finding hidden design flaws in designs 
that can cause a manufacturing or field disaster, especially flaws that result 
in a problem once in a week or month of significant consequence that cannot be 
found by normal engineering methods. Next one is in a few weeks, mid-October. 
Contact me if interested.

Doug
[https://lh4.googleusercontent.com/_HuR3Ky2TF_XhFHyxnYRmiq7nHQldnMsPNYFaLG6kb5T4y8MeCe-BDC_BscJtSFgszSSjssihHS-pjM3-jwNP8S0CwE-gN8fsRsPkojiAlmpBwb20vIVizS-siCUywW_jqrefbVr]

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
[email protected]

All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/

Website:  https://ewh.ieee.org/soc/pses/
Instructions:  https://ewh.ieee.org/soc/pses/list.html (including how to 
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html

For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to