Mike,

Is someone needs to work on one sub-system the manual will direct them to 
unlug, disconnect, the power cord for that specific sub-system.

However, there may be a need to bring down the entire system, and so the 
facility disconnect.

Thanks.

>     On 05/15/2023 9:06 PM MIKE SHERMAN <[email protected]> wrote:
> 
> 
>     Steve --
> 
>     Fun questions!
> 
>     (I am a person with documented tendencies to not take the trouble to go 
> to a breaker panel to find and disconnect the correct breaker, so I may be 
> taking a different approach here...)
> 
>     Nameplate
>     I regard the nameplate as information for the installing electrician on 
> how to size the facility breaker and the wiring to the equipment (ceiling 
> panel). So I agree with your approach, from what I understand from your 
> description.
> 
>     Labels and LOTO
>     I would explore, with your client, any incentives for the user to simply 
> disconnect the power cord for a single subsystem from the ceiling panel to 
> work on that subsystem, so that the entire system would not have to be taken 
> down and restarted. If that seems reasonably foreseeable, you may need 
> additional risk mitigations beyond what you propose.
> 
>     Good to see you at ISPCE, too!
> 
>     Mike Sherman
>     Sherman PSC LLC
> 
> 
> 
>         > >         On 05/15/2023 6:25 PM CDT Steve Brody 
> <[email protected]> wrote:
> > 
> > 
> >         Experts.
> > 
> >         First, it was good to see those who were at ISPCE in Dallas.
> > 
> >         Back to the question at hand, and a proposed solution.  But I still 
> > request ay comments/inputs.
> > 
> >         I have a client who makes products to their customer's 
> > requirements.  The end product includes several products, sub-systems, that 
> > work together in the end product to perform the intended task.
> > 
> >         Each of the subsystems has its own power cord that plugs into an 
> > outlet in a ceiling panel which has an outlet for each of the sub-systems.
> > 
> >         Power to the ceiling panel is derived from a single facility panel 
> > that has a LOTO breaker.
> > 
> >         It is my thought that the following should be done:
> >             * The system nameplate current rating should be inclusive of 
> > all sub-systems and system power
> >             * that there be a label adjacent to the nameplate indicating 
> > that there are 'x' number of power cords, and that the disconnect for the 
> > systems the facility panel number
> >         Thoughts?
> > 
> >         Thanks in advance,
> > 
> >         Steve Brody
> >         [email protected] mailto:[email protected]
> >         C - 603 617 9116
> >         -
> >         ----------------------------------------------------------------
> > 
> >         This message is from the IEEE Product Safety Engineering Society 
> > emc-pstc discussion list. To post a message to the list, send your e-mail 
> > to <[email protected] mailto:[email protected] >
> > 
> >         All emc-pstc postings are archived and searchable on the web at: 
> > http://www.ieee-pses.org/emc-pstc.html
> > 
> >         Website: http://www.ieee-pses.org/
> >         Instructions: http://www.ieee-pses.org/list.html (including how to 
> > unsubscribe) http://www.ieee-pses.org/list.html
> >         List rules: http://www.ieee-pses.org/listrules.html
> > 
> >         For help, send mail to the list administrators:
> >         Mike Cantwell <[email protected] mailto:[email protected] >
> > 
> >         For policy questions, send mail to:
> >         Jim Bacher <[email protected] mailto:[email protected] >
> >         David Heald <[email protected] mailto:[email protected] >
> > 
> > 
> >         ---------------------------------------------
> > 
> >         To unsubscribe from the EMC-PSTC list, click the following link: 
> > https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1
> > 
> >     > -
>     ----------------------------------------------------------------
> 
>     This message is from the IEEE Product Safety Engineering Society emc-pstc 
> discussion list. To post a message to the list, send your e-mail to 
> <[email protected] mailto:[email protected] >
> 
>     All emc-pstc postings are archived and searchable on the web at: 
> http://www.ieee-pses.org/emc-pstc.html
> 
>     Website: http://www.ieee-pses.org/
>     Instructions: http://www.ieee-pses.org/list.html (including how to 
> unsubscribe) http://www.ieee-pses.org/list.html
>     List rules: http://www.ieee-pses.org/listrules.html
> 
>     For help, send mail to the list administrators:
>     Mike Cantwell <[email protected] mailto:[email protected] >
> 
>     For policy questions, send mail to:
>     Jim Bacher <[email protected] mailto:[email protected] >
>     David Heald <[email protected] mailto:[email protected] >
> 
> 
>     ---------------------------------------------
> 
>     To unsubscribe from the EMC-PSTC list, click the following link: 
> https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1
> 

Steve Brody
[email protected] mailto:[email protected]
C - 603 617 9116

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to