Agreed – though that is on the basis that each module “needs” a ground – maybe 
consider clauses such as 8.2.3 which cover continuity of bonding during routine 
maintenance

As for the terminal blocks, something recognised to UL1059 should be acceptable 
IMO

Regards
Charlie

Charlie Blackham
Sulis Consultants Ltd
Tel: +44 (0)7946 624317
Web: https://sulisconsultants.com/
Registered in England and Wales, number 05466247

From: Grasso, Charles <[email protected]>
Sent: 18 June 2019 19:49
To: [email protected]
Subject: Re: [PSES] Grounding

My 2c – You are correct (MOO).

Thanks!

Charles Grasso
W: 303-706-5467

From: Steve Brody [mailto:[email protected]]
Sent: Tuesday, June 18, 2019 12:39 PM
To: [email protected]<mailto:[email protected]>
Subject: [PSES] Grounding


 This message originated outside of DISH and was sent by: 
[email protected]<mailto:[email protected]>

HI all,



I have a client with whom I am having a discussion about grounding for an EN 
60204-1 product.  The product consists of 3 sub-modules all of which use mains 
power derived from the first module where the external mains comes into the 
unit.



In the first module the ground from the branch circuit goes to a ground stud, 
lockwasher and nut, and from there a ground wire goes from the stud to a DIN 
rail mounted Wago terminal block designed for grounds, as it is green/yellow in 
color, which is screwless and uses spring pressure to secure the wire in place. 
 Other internal grounds in this module also connect to this block.



The second module receives the main ground from the first module in a similar 
arrangement, and the third module gets it's ground from the second module.



I have pointed out to my client that, in accordance with all safety standards I 
am aware of, and a figure in EN 60204-1 on grounds, that modules 2 and 3 must 
have ground leads that goes back to the point where the main ground comes into 
the unit originally, and not daisy chained from module to module.



I don't think there is anyone who will disagree with this but I did say I would 
ask the question.  Second question is do you thin there is a problem is using a 
screwless pressure connector for the grounds, as opposed to a 
stud/lockwasher/nut?



Thoughts and comments would be appreciated by reply to his or privately at 
[email protected]<https://connect.xfinity.com/appsuite/[email protected]>
-
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]<mailto:[email protected]>>

All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to 
unsubscribe)<http://www.ieee-pses.org/list.html>
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]<mailto:[email protected]>>
Mike Cantwell <[email protected]<mailto:[email protected]>>

For policy questions, send mail to:
Jim Bacher <[email protected]<mailto:[email protected]>>
David Heald <[email protected]<mailto:[email protected]>>
-
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]<mailto:[email protected]>>

All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to 
unsubscribe)<http://www.ieee-pses.org/list.html>
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]<mailto:[email protected]>>
Mike Cantwell <[email protected]<mailto:[email protected]>>

For policy questions, send mail to:
Jim Bacher <[email protected]<mailto:[email protected]>>
David Heald <[email protected]<mailto:[email protected]>>

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to