I've recently started clocking the work that I'm doing, and am now
considering a month-end report. Is it possible to have one table per
project with each line being that days total time entries? I've seen
how to get it showing each days entries but not in separate lines
within the table. The method described online splits each days
entries into separate split tables.

But I'm looking for one table with a maximum of 31 lines which
correspond to each days entries. Is it possible please?

Thanks
Sharon.
-- 
A taste of linux = http://www.sharons.org.uk
TGmeds = http://www.tgmeds.org.uk
Debian 8.0, fluxbox 1.3.7, emacs 24.5.50.1

Attachment: signature.asc
Description: PGP signature

Reply via email to