On Mon, Jul 18, 2016 at 04:21:17PM -0500, Ryan Moats wrote:
> This code changes to allow incremental processing of the
> logical flow and physical binding tables whenver possible.
> 
> Note: flows created by physical_run for multicast_groups are
> *NOT* handled incrementally due to to be solved issues
> with GWs and local routers.
> 
> Signed-off-by: Ryan Moats <rmo...@us.ibm.com>

With this applied, I get a number of apparently consistent test failures
(literally no passes in 5+ runs) that I don't see, at least not
consistently, if I revert it:

    OVN end-to-end tests

    2106: ovn -- vtep: 3 HVs, 1 VIFs/HV, 1 GW, 1 LS       FAILED (ovn.at:1307)
    2107: ovn -- 3 HVs, 1 VIFs/HV, 1 software GW, 1 LS    FAILED (ovn.at:1473)
    2108: ovn -- 3 HVs, 3 LS, 3 lports/LS, 1 LR           FAILED (ovn.at:1887)
    2110: ovn -- 2 HVs, 2 LS, 1 lport/LS, 2 peer LRs      FAILED (ovn.at:2416)
    2115: ovn -- 2 HVs, 3 LRs connected via LS, static routes FAILED 
(ovn.at:3053)

Do these pass reasonably often for you?  (Maybe my changes to the
previous patch screwed something up?)
_______________________________________________
dev mailing list
dev@openvswitch.org
http://openvswitch.org/mailman/listinfo/dev

Reply via email to