> On Oct 4, 2018, at 11:00 PM, Eric Smith via cctalk <[email protected]>
> wrote:
>
> On Thu, Oct 4, 2018, 14:19 Eric Smith <[email protected]> wrote:
>
>> except that in the Pelkey account the Alto network wasn't designed and
>> built until June, _after_ the name change.
>>
>
> I should have written that it the design and construction _started_ in
> June. The initial Ethernet wasn't completed until late 1974.
>
> CAUTION: This email originated from outside SwRI and it may contain
> attachments and/or links. Do not open attachments or click on links unless
> you recognize the sender and know the content is safe.
Good talk. I’ll summarize my notes and post tonight.
Apologies for top-posting earlier, I was in a hurry.
- Mark