Hello. Let's say I have three jobs (each running on MySchedule): _ backup a (priority=10); _ backup b (priority=10); _ backup catalog (priority=11).
Let's say I have three pools (1, 2 and 3). Each month I'd like to take full backups of all three jobs on all three pools, so I write: Schedule { Name = "MySchedule" Run = Level=Full Pool=1 Storage=Tapes 1st sun at 0:05 Run = Level=Full Pool=2 Storage=Tapes 1st sun at 1:05 Run = Level=Full Pool=3 Storage=HD 1st sun at 2:05 } The problem is that the three backup catalogs are taken after all the others. I need instead all backups on each pool to be made consecutively. I wonder if I could write something like: Schedule { Name = "MySchedule" Run = Level=Full Pool=1 Storage=Tapes Priority=-10 1st sun at 0:05 Run = Level=Full Pool=2 Storage=Tapes Priority=-6 1st sun at 1:05 Run = Level=Full Pool=3 Storage=HD 1st sun at 2:05 } Is it possible? Any other way to achieve what I need? bye & Thanks av. ------------------------------------------------------------------------- This SF.net email is sponsored by: Splunk Inc. Still grepping through log files to find problems? Stop. Now Search log events and configuration files using AJAX and a browser. Download your FREE copy of Splunk now >> http://get.splunk.com/ _______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users