On 1/29/07, Aaron Knister <[EMAIL PROTECTED]> wrote: > I have an ADIC i500 tape library with 36 slots and two LTO-3 tape > drives. There are currently 8 tapes in the loader and they're defined in > a storage pool (and labeled by bacula). I have two jobs that reference > this storage pool. However, when I run I can only get one of the drives > to work at a time. Is there a way to have each job load a tape into each > drive and write to them concurrently? >
I am not sure if this has changed as of bacula-2.0 but when I setup my jobs with 1.38.11 to get this to work reliably I had to send two jobs to the drives themselves and not the changer itself. Before I forget I did this with more than one pool. John ------------------------------------------------------------------------- Take Surveys. Earn Cash. Influence the Future of IT Join SourceForge.net's Techsay panel and you'll get the chance to share your opinions on IT & business topics through brief surveys - and earn cash http://www.techsay.com/default.php?page=join.php&p=sourceforge&CID=DEVDEV _______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users