On 1/29/07, Aaron Knister <[EMAIL PROTECTED]> wrote:
> I have an ADIC i500 tape library with 36 slots and two LTO-3 tape
> drives. There are currently 8 tapes in the loader and they're defined in
> a storage pool (and labeled by bacula). I have two jobs that reference
> this storage pool. However, when I run I can only get one of the drives
> to work at a time. Is there a way to have each job load a tape into each
> drive and write to them concurrently?
>


I am not sure if this has changed as of bacula-2.0 but when I setup my
jobs with 1.38.11 to get this to work reliably I had to send two jobs
to the drives themselves and not the changer itself. Before I forget I
did this with more than one pool.

John

-------------------------------------------------------------------------
Take Surveys. Earn Cash. Influence the Future of IT
Join SourceForge.net's Techsay panel and you'll get the chance to share your
opinions on IT & business topics through brief surveys - and earn cash
http://www.techsay.com/default.php?page=join.php&p=sourceforge&CID=DEVDEV
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to