I have an ADIC i500 tape library with 36 slots and two LTO-3 tape 
drives. There are currently 8 tapes in the loader and they're defined in 
a storage pool (and labeled by bacula). I have two jobs that reference 
this storage pool. However, when I run I can only get one of the drives 
to work at a time. Is there a way to have each job load a tape into each 
drive and write to them concurrently?

-Aaron

-------------------------------------------------------------------------
Take Surveys. Earn Cash. Influence the Future of IT
Join SourceForge.net's Techsay panel and you'll get the chance to share your
opinions on IT & business topics through brief surveys - and earn cash
http://www.techsay.com/default.php?page=join.php&p=sourceforge&CID=DEVDEV
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to