How long is the link?
On 1/23/2025 4:15 PM, Jason McKemie wrote:
That is correct.
On Thu, Jan 23, 2025 at 3:53 PM Josh Luthman
<j...@imaginenetworksllc.com> wrote:
You can get the equipment back at the end of the contract, right?
On Thu, Jan 23, 2025 at 4:47 PM Jason McKemie
<j.mcke...@veloxinetbroadband.com> wrote:
I'm putting in a bid to deliver a 1G symmetric dedicated
circuit. What are my options for PtP gear that can accomplish
this? I was thinking AF11, but their advertising is misleading
as it looks like (at least in the US) it can do just under
700M. This is a 12 month commitment, so Aviat is probably out
of the budget.
-Jason
--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com