What is the going rate per foot for HDD drilling and pullback of two SDR11 ducts and a trace wire? Very sandy soil in the FL panhandle. All materials provided? Around 4-5K' split into three or four runs.
-- Carl Peterson *PORT NETWORKS* 401 E Pratt St, Ste 2553 Baltimore, MD 21202 (410) 637-3707
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com