Since theres no clear documentation and you turned down my cuss documents.
How much can I push my luck on the sync/serial cables between injectors? Im
thinking about just going to some small boxes i found. 1 for each power
supply and syncinjector connected with liquidtight. The site im looking at
cleaning up in this manner would convert over to about 9 or 10
syncinjectors.
 How far can i push total cable length before i need to add another site
monitor and start a new chain?

Also, If you send me one each of your units and a miller lite stipend, Ill
build you out your documents. give me a Jameson stipend and ill complete
them twice as fast and salty. Ill only refer to other vendor products as
useless mousedicks 3 or four times per document because im a professional
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to