youre killin me smalls
good work though, im pretty excited about this, i dont get excited much
when im sober

On Wed, Feb 26, 2020 at 12:08 PM Forrest Christian (List Account) <
li...@packetflux.com> wrote:

> Very close.   I can't give you an exact date right this second, as there
> are too many moving parts which all have to come together.  I'm going
> through and doing all the validation work at this point and cleaning up
> anything I find.   I'm guessing the week or two after WISPAMERICA at this
> point but it could slide another couple weeks as a result of the challenges
> in obtaining raw materials right now.
>
> I ended up spending a couple of months back in November/December figuring
> out that the SNMP code that we've been using for years (including in the
> RackInjector) wasn't going to work for the SiteMonitor 3.  And then trying
> and then giving up on a couple of alternative SNMP stacks.  After the
> holidays, I ended up writing an SNMP stack from scratch and that triggered
> some other code changes since there were some architecture decisions I made
> to attempt to get around the shortcomings in the original SNMP stack which
> weren't valid anymore.  Made things a lot nicer/easier, but it was work
> getting it there.   February has been all about getting the work done I
> expected to be doing in November and December.
>
> At this point it's mostly about doing the final release process and then
> doing integration with the Automatic Test.   Once that is done and I've
> 100% verified that the board design I have is good, we'll order production
> boards. There is a chance that I'll end up having to do an additional
> (minor) board revision during this process.  Normally if that happens, I'll
> typically order 10 or so of the new design to verify I didn't screw
> something up in the process of fixing whatever was broken, but in this
> case, I'll increase the order to whatever is pre-ordered so I can at least
> get those out.
>
> Of course like anything with a schedule the crap could hit the fan and
> this schedule goes out the window.
>
> I will be doing a walkthough of the new devices in the PacketFlux session
> on thursday afternoon.
>
>
> On Wed, Feb 26, 2020 at 10:39 AM Steve Jones <thatoneguyst...@gmail.com>
> wrote:
>
>> Its getting at the end of February, what are we looking at in
>> availability of these bad boys?
>> --
>> AF mailing list
>> AF@af.afmug.com
>> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>>
>
>
> --
> - Forrest
> --
> AF mailing list
> AF@af.afmug.com
> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to