Thanks Chuck. The question for the borg is would you do both at the rack? i.e B) Device--GDT---------(wire run)-----------GDT---FUSE--Netonix
Note I fixed B to show the fuse in the right place Also, will the FUSE modules support AF-24? On Mon, Jul 1, 2019 at 10:17 AM <ch...@wbmfg.com> wrote: > No Netonix supplying POE should be connected to any surge suppressor. If > you want to protect that line run it through a fuse first then to the surge > suppressor and on to the rest of the circuit. > > *From:* Carl Peterson > *Sent:* Monday, July 1, 2019 8:55 AM > *To:* AnimalFarm Microwave Users Group > *Subject:* [AFMUG] POE Fuse, GDT surge, or both at rack before Netonix > Switch > > Lost a netonix IDC switch this weekend. May have been weather related as > there was a surge suppressor at an AF24 with some issues post switch > replacement. > > I want to clean things up but I'm concerned about surge suppressors and > the netonix switch. > > Should it be: > A) Device-GDT---------(wire run)-----------FUSE----Netonix > B) Device--GDT---------(wire run)-----------FUSE---GDT--Netonix > > B would mean the line comes in, plugs into one of Chucks GDT modules in a > PRM-24, then loops to one of Chucks gas discharge modules, then to the > switch. Seems complicated. Is there a combined surge/gdt module for the > APC style slots? I feel like I've asked this before. > > -- > > Carl Peterson > > *PORT NETWORKS* > > 401 E Pratt St, Ste 2553 > > Baltimore, MD 21202 > > (410) 637-3707 > > ------------------------------ > -- > AF mailing list > AF@af.afmug.com > http://af.afmug.com/mailman/listinfo/af_af.afmug.com > > -- > AF mailing list > AF@af.afmug.com > http://af.afmug.com/mailman/listinfo/af_af.afmug.com > -- Carl Peterson *PORT NETWORKS* 401 E Pratt St, Ste 2553 Baltimore, MD 21202 (410) 637-3707
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com