Hi, Has anyone seen their Exchange backups fail with this error number and it NOT being anything to with log file permissions?
07/10/2009 20:14:38 ANS1909E The scheduled command failed. 07/10/2009 20:14:38 ANS1512E Scheduled event 'FRI_INCR' failed. Return code = -1073741819. 07/11/2009 02:13:52 ANS1909E The scheduled command failed. 07/11/2009 02:13:52 ANS1512E Scheduled event 'SAT_FULL' failed. Return code = -1073741819. 07/12/2009 12:01:01 ANS1909E The scheduled command failed. 07/12/2009 12:01:01 ANS1512E Scheduled event 'SUN_INCR' failed. Return code = -1073741819. And, is it not possible to run a trace over the scheduled backup? The IBM site says it is only enabled when activating the GUI with options. http://publib.boulder.ibm.com/infocenter/tivihelp/v1r1/topic/com.ibm.itsmm.doc/b_pdg_master179.htm#dqx2r_pdg_xchngtrace I'd really like to trace the Exchange scheduled operation, to see what is actually producing the -1073741819 error code. Cheers :) Matthew