We've had a problem with our 3494 from day one with unexpected power
outages. Our CE claims theres a design flaw in the power sequencing module,
we've had three outages since Oct 2000 and all have been fixed by flipping
the breaker to the 3494 and powering the box back on. Two of the outages were
to move it over to a "total UPS".
Edward(Ed) J. Finnell, III
Big Honkin' M/F Mgr.
www.ua.edu or bama.ua.edu/archives/ibm-main.html


Reply via email to