We've had a problem with our 3494 from day one with unexpected power outages. Our CE claims theres a design flaw in the power sequencing module, we've had three outages since Oct 2000 and all have been fixed by flipping the breaker to the 3494 and powering the box back on. Two of the outages were to move it over to a "total UPS". Edward(Ed) J. Finnell, III Big Honkin' M/F Mgr. www.ua.edu or bama.ua.edu/archives/ibm-main.html
- Power Distribution Unit Failure Indra Gunawan
- Re: Power Distribution Unit Failure Seay, Paul
- Re: Power Distribution Unit Failure Edward(Ed) J. Finnell, III
- Re: Power Distribution Unit Failure Steve Harris