Thank you for the replies. The main thing I am trying to prevent is the cancellation of the job because of the failure of TSM to recognize that repeated mounts of a bad tape is not going to make the tape "all better" and usable. The failure of the job to complete has a domino affect on subsequent schedules. This leaves our DR exposed because the "Copypool" data for the offsite vault is not complete. Frank McClean [EMAIL PROTECTED] 916.658.1353
- Repeated mount of bad scratch tape McClean, Frank
- Re: Repeated mount of bad scratch tape Ruddy STOUDER
- Re: Repeated mount of bad scratch tape Richard Sims
- Re: Repeated mount of bad scratch tape McClean, Frank
- Re: Repeated mount of bad scratch tape David Longo
- Re: Repeated mount of bad scratch tape McClean, Frank
- Re: Repeated mount of bad scratch tape Richard Sims
- Re: Repeated mount of bad scratch tape McClean, Frank
- Performance tuning. Marco Supino
- Re: Performance tuning. Ray Pratts
- Re: Repeated mount of bad scratch tape S W Branch
- Re: Repeated mount of bad scratch tape McClean, Frank
- Re: Repeated mount of bad scratch tape Davidson, Becky
- Re: Repeated mount of bad scratch tape McClean, Frank