Current Dev Position: YP 2.7 M3 (New feature Freeze has begun.) Next Deadline: YP 2.7 M3 Cutoff was Feb. 25, 2019
SWAT Team Rotation: * SWAT lead is currently: Ross * SWAT team rotation: Ross -> Chen on Mar. 1, 2019 * SWAT team rotation: Chen -> Armin on Mar. 8, 2019 * <https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team> https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Key Status/Updates: * We have now passed the feature freeze point for 2.7 * YP 2.7 M2 rc2 is out of QA and being readied for release. See: <https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_ M2_RC2> https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_M 2_RC2 and <https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_ Target_Feb._1.2C_2019> https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_T arget_Feb._1.2C_2019 * We now have resulttool, buildhistory and build-performance all working with the autobuilder and will be using this as the primary QA mechanism going forward. More details can be found here: <http://lists.openembedded.org/pipermail/openembedded-architecture/2019-Febr uary/001591.html> http://lists.openembedded.org/pipermail/openembedded-architecture/2019-Febru ary/001591.html * There were some serious usability issues found with multiconfig, those have been fixed in master and thud. * Various recipe upgrades made it in, thanks to all who contributed. Several recipes also converted to meson including glib-2.0 and gdk-pixbuf. * We now need to build M3 as we're past feature freeze point for 2.7. Right now we're aware of the following things which ideally need to be resolved first: * Bug 13178 "X server and matchbox desktop don't start up properly on beaglebone" needs to be fixed * Find the framebuffer problem with qemuarmv7 and switch to that * Several ptest issues would be addressed (missing openssl tests, 3 timeouts) * Arm build host issues identified and resolved * It's unlikely we'll switch to virtgl by default for 2.7 due to lack of testing from the community although the base patches for this have merged. Planned Releases for YP 2.7: * YP 2.7 M2 rc2 is out of QA. * YP 2.7 M2 Release Target was Feb. 1, 2019 * YP 2.7 M3 Cutoff is Feb. 25, 2019 * YP 2.7 M3 Release Target is Mar. 8, 2019 * YP 2.7 M4 Cutoff is Apr. 1, 2019 * YP 2.7 M4 Release Target is Apr. 26, 2019 Planned upcoming dot releases: * YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done. * YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done. * YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done. Tracking Metrics: * WDD 2415 (last week 2392) ( <https://wiki.yoctoproject.org/charts/combo.html> https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1516 (last week 1527) * Patches in the Pending State: 660 (44%) [last week 663 (43%)] Key Status Links for YP: <https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status> https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status <https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule> https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule <https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features> https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features The Status reports are now stored on the wiki at: <https://wiki.yoctoproject.org/wiki/Weekly_Status> https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager * Cell: (208) 244-4460 * Email: sjolley.yp...@gmail.com <mailto:sjolley.yp...@gmail.com>
-- _______________________________________________ yocto mailing list yocto@yoctoproject.org https://lists.yoctoproject.org/listinfo/yocto