Status Summary: - Thanks to the team for sending in status via email, now we have up to date status on the wiki before this meeting. - 72 M2 features, 16 Done, 17 Patch Review, 34 Dev/Accept (10 in A/B/C), 1 on-going, 3 Design, 1 Design Review. - Half still in development but close to be done. Needs attention to catch up. Issues 1. Layer tooling design review: this is done (Richard) 2. Build Yocto behind firewall - complete, patch review (Joshua/Darren): There will be some improvement in for this in M2, we need additional follow-on item for this one in M3 3. Item not on schedule: "Time limited kernel' (Bruce) : this is bug 1007, design is done, working on development, making this in M2 is still a bubble. 4. Liping: Image Creator: HOB performance enhancement Blocked,Liping's code need to wait for Joshua's code to merge first. Risk to slip 5. running post installs at rootfs gen time, Sprint D: Dexuan has a design but the PRC team has no time for this one: Drop this from the 1.1 schedule but keep it on feature list for post 1.1 action. 6. Beth: need to discuss a 1.0 release of yocto-autobuilder: No need for this now Build status: A build out yesterday and there is a QA report this morning. Team will look at the QA report and address bugs uncovered.
Bug Status: 1. 7 M2 new bugs: Richard (2), Saul (2), Nitin (3) 2. 3 M2 high bugs: * 1134: Saul will give more info to Ke to recreate this. * 1099: Song will send Dexuan email on the status of this one * 1007: Bruce started development on this one. Documentation: there is a draft of the Yocto development guide being reviewed. So this is done. Sprint D (current week) items: 1. BSP config cleanup : need a follow on item for this in M3 2. Kernel Tools : move to M3 3. kernel bloat - development: move to M3 4. BBMX: done, Darren will open a new bug to track a related issue. 5. 3G - complete: working on some revision and fixes, needs attention, risk to slip 6. Enhance the deploy part in remote debug: developer assigned to something else, move to M3 Action Item: 1. Song: update Google calendar with the new bridge info 2. Darren: open a new bug to track a BBXM related issue 3. Bruce: Split bug 414 into multiple ones to work and track separately 4. Song: send Dexuan note about bug 1099. No meeting next week due to US holiday on Tuesday _______________________________________________ yocto mailing list yocto@yoctoproject.org https://lists.yoctoproject.org/listinfo/yocto