Hi all,

F0 milestone is complete.

RC1 milestone is scheduled to for next Wednesday 7 August 2019,
commencing at 18:00 UTC.

Please get all of the low-risk patches required for VPP Release 19.08
merged into master branch before then.

On Wednesday at 18:00 UTC the branch 'master' will be closed for the
period of time that it takes to create 'stable/1908' with the
associated Jenkins jobs operational.

A refresher about the life after RC1:

Once the stable branch is pulled, only bug fixes are allowed to be
merged there, and all bug fixes should conform to the following rules:

  - All bug fixes must be double-committed to the release throttle as
well as to the master branch
  - Commit first to the release throttle, then "git cherry-pick" into master
  - Manual merges may be required, depending on the degree of
divergence between throttle and master
  - All bug fixes need to have a Jira ticket
  - Please put Jira IDs into the commit messages.
  - Please use the same Jira ID for commits into the stable branch and master.

--a
<Your friendly 19.08 release manager>
-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.

View/Reply Online (#13634): https://lists.fd.io/g/vpp-dev/message/13634
Mute This Topic: https://lists.fd.io/mt/32671722/21656
Group Owner: vpp-dev+ow...@lists.fd.io
Unsubscribe: https://lists.fd.io/g/vpp-dev/unsub  [arch...@mail-archive.com]
-=-=-=-=-=-=-=-=-=-=-=-
  • ... Andrew Yourtchenko
    • ... Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco) via Lists.Fd.Io
      • ... Andrew Yourtchenko

Reply via email to