1) so they are wearing jackets in the warehouse; in many tilt-up industrial 
parks like this, a small (front) section is walled off and made into offices 
and *is* heated, whereas the large warehouse section is not heated to save on 
heating costs.

2) Geez, I think there is more than one large shipping container in the world. 
For christ's sake, he very likely obtained another container immediately after 
the other one left!  After all, IF he had an actual customer for the first one 
as Jones says, then he OBVIOUSLY is working on getting the next one ready, and 
would have obtained another container and begun installing all the 'guts'.  It 
is now over two months since the first one was taken away, so how much time is 
needed to install the guts??? If you've got all the e-Cats, then installing 
racking and wiring and piping, etc. wouldn't take more than a few weeks at most.

-----Original Message-----
From: Jones Beene [mailto:[email protected]] 
Sent: Wednesday, January 18, 2012 10:57 AM
To: [email protected]
Subject: RE: [Vo]:Interesting new video from ecat.com

"Have I missed anything else?"

Only the lie where Rossi says the "customer" did not return it.



-----Original Message-----
From: Akira Shirakawa 

Hello group,

Have a look at this interesting Youtube video by ecat.com:
http://www.youtube.com/watch?v=odkfAjqA4pc

Apparently it's been filmed on January 12th. It shows that:
- Rossi is currently in Bologna
- Rossi's test site appears to be cold
- The 1 MW E-Cat container shown during the last "public" demo is in Bologna too
- There appears to be a new control box.

Have I missed anything else?

Cheers,
S.A.



Reply via email to