On Nov 7, 2011, at 11:24 AM, Stephen A. Lawrence wrote:

Ah -- Sorry, Horace, disregard my question. I overlooked the fact that you're ignoring the Oct 28 test, which was the (alleged) 470kW run.

(In any case, you obviously are well aware of the heat-of- vaporization issues.)


Yes. I am having problems keeping track of things, and have not been able to read much on vortex of late. Sorry I am a bit behind responding, and our messages crossed.

Something of possible interest is that the (real) cement slab data is here:

http://www.mtaonline.net/~hheffner/Graph6Sb.png

This can be compared to the fire brick data here:

http://www.mtaonline.net/~hheffner/Graph6S.png

The cement data shows the peak energy output much delayed vs the fire brick, around T540 vs T330. However the peak power out delivered is less. A similar phenomenon should occur if controls are used to cut back the power out to make a 6 hour run vs 4 hour run. If the power out were actually from nuclear energy, not thermal energy stored using electric power, then such a large drop in output should not be necessary to accommodate the longer run time. Rossi actually stated on his blog, if I recall correctly, that the power was reduced from 1 MW because the (prospective) customer required 6 hours instead of 4.

Obviously the shortcoming from the 1 MW output expectation (objective?) was the fault of the customer! 8^)

Obviously, I claim, as I wave my arms wildly.  8^)

Best regards,

Horace Heffner